A board with columns and cards is often the first tool a team adopts to move on from spreadsheets and sticky notes. Trello built its whole reputation on that. But once the columns are set up, you still need to fit in meetings elsewhere, take meeting notes in another tool, and store files in a third one. Flots starts from the opposite idea: bring tasks, calendar, notes and documents together in one place.
Trello: the benchmark for a simple kanban board
Trello made kanban accessible to everyone. Columns, cards, drag and drop: nothing to learn, everything makes sense within a minute. The free plan allows up to 10 collaborators and unlimited cards, plenty to launch a first team board. Butler, its automation engine, lets you build simple rules ("move the card to Done when every checkbox is checked") without writing a line of code.
For a team that just wants to visualize a workflow, column by column, Trello remains a sound choice. The problem shows up the moment you want to step outside the board.
What Trello lacks once the team grows
Trello has no calendar. Its Calendar view, locked behind the Premium plan at $10/user/month, shows the due dates of existing cards: it doesn't let you schedule a meeting, block out work time, or see your workload for the day. A reshuffled list of dates, not a calendar.
Notes don't exist natively either. No text editor, no team wiki: documentation lives in card descriptions or migrates to a separate tool. Same story for documents, limited to attachments on individual cards, with no folders and no cross-board search. The result: a growing team ends up bolting a calendar, a notes tool and a storage space onto its Trello board, syncing everything by hand between screens.
Since Atlassian, development steered toward the suite
Trello has belonged to Atlassian since 2017, acquired for $425 million. Product effort since then has mostly gone into integrating with the Atlassian suite (Jira, Confluence), not into adding a native calendar or notes.
The interface redesign rolled out in 2025 sparked a wave of user backlash, with some comparing it to the worst software updates they'd ever seen. Excel export, once free, has since moved behind a paywall. The kanban board evolves at the pace of Atlassian's suite strategy, not at the pace of a small team's needs.
Flots: organized tasks, calendar, notes and documents in one place
Flots doesn't try to clone a kanban board feature for feature. Tasks are organized by categories and projects, which is enough for most teams to see where each subject stands, without dragging cards between columns. The calendar, on the other hand, is native: a meeting or a work block goes down in one click, with Google Calendar sync and adjustable working hours.
Notes come with a markdown editor and PDF/Word export. Documents (PDF, JPEG, PNG, HEIC) import by drag and drop and sit in folders, instead of getting buried as a card attachment months later. Projects finally bring tasks, notes and milestones together around one subject, with assignment for working as a team.
The real gain shows up on the day itself. Trello says nothing about your actual schedule: whether a card is in progress or done, you still need to open another tool to know when to handle it. The Flots calendar shows tasks alongside appointments, ready to be dragged into an open slot.
Trello vs Flots: the comparison
The Trello prices below come from its official pricing page (August 2026), ours from our pricing page.
| Criteria | Trello | Flots |
|---|---|---|
| Core product | Kanban board, columns and cards | Tasks by category, calendar, notes and documents together |
| Calendar | Calendar view on Premium, card due dates only | Native: one-click appointments, Google Calendar sync, working hours |
| Notes and documents | No native editor; attachments per card | Markdown editor with PDF/Word export; documents in folders |
| Automation | 250 free runs/month, unlimited from $10/user/month | Task recurrence included, no run limit |
| Individual price | Free (10 collaborators) or $5/user/month (Standard) | €8 excl. tax/month, 1 year free on signup |
| Full team price | $10/user/month (Premium, advanced views) | €15 excl. tax/user/month |
Trello or Flots: how to choose
If your needs stop at a visual board for tracking a simple workflow, without ever needing to schedule a meeting or keep a note in the same tool, Trello remains an honest choice. Its original simplicity hasn't aged a bit.
The equation changes once the team grows and the board no longer captures the whole week: a client meeting to fit in, meeting notes to find again, a file sent the day before. Flots is built for exactly that moment, when it's time to stop opening four tools for a single day of work.
Get out of the tool pile-up
A dedicated article looks at how a small team can stop stacking apps around its task board.
Read the articleTrello remains a good entry point for a first board. For a team that has outgrown it and wants tasks, calendar, notes and documents without switching tabs, Flots is worth the test.
Move from an isolated board to a connected space.
Tasks by category, calendar, notes and documents together, without juggling several tools.


