A move means dozens of small tasks, half of which have a deadline and none of which warn you when it's coming. The forgotten notice, the internet box canceled too late, the "misc" box you open six months later.
Here's how to lay it all out, from 60 days before to 30 days after, in a Flots project you share with the person moving with you.
Start from key day
Everything is built backward from a single fixed point: the day you hand back the keys to your old place (or get the keys to the new one). That's the principle of a reverse schedule: you start from the deadline and work your way back to today.
One exception to keep in mind from the start: the notice period. In France, for an unfurnished rental, it is normally three months. It drops to one month in a high-demand area (zone tendue), for a furnished rental, or in certain personal situations. Check your case on the tenant notice page of service-public.gouv.fr, and use its notice period simulator to find out whether your town is in a zone tendue. If it's three months, your 60-day mark comes too late: the notice goes out before everything else.
Create a shared "Move" project
In Flots, a project brings together the tasks, notes, documents and milestones for one subject. A move is a textbook case: it lasts two or three months, then it's over.
Create the project, then add your partner or roommates as members, using the email of their Flots account. Everyone finds the project in their own space, next to their usual tasks.
Then assign. A task in the project can be handed to a member: it shows up in their list, and progress moves as soon as they check it off. With two people, that's what prevents the "I thought you'd called the movers."
The moving timeline, from 60 days before to 30 days after
Each row becomes a task in the project, with its due date. Adjust the timing to your situation: this table gives an order of operations to fine-tune.
| When | To do |
|---|---|
| Before D-60 if 3-month notice | Send your notice to the landlord, keep the acknowledgment of receipt |
| D-60 | Get three quotes from movers (or book a van), set the date |
| D-45 | List your subscriptions: energy, internet box, home insurance, health insurance… |
| D-30 | Notify each provider: cancellation or transfer, effective on moving day |
| D-30 to D-7 | Pack room by room, starting with what you don't use |
| D-15 | Book the inspection appointments, move-out and move-in |
| D-7 | Pack the "first night" box and the important papers to keep on you |
| Moving day | Inspection, photos of meter readings, key handover |
| D+1 to D+30 | Change of address, electoral roll, vehicle registration, remaining organizations |
The change of address has its own window. In France, the online change-of-address service accepts the declaration from three months before to one month after the move, and notifies several government bodies at once. It doesn't cover everything: apart from a few energy suppliers, private companies (internet box, bank, insurance…) still have to be contacted one by one.
Dated tasks and reminders: leave nothing to memory
A due date puts the task at the right moment. A reminder warns you when the time comes, without rereading the list every evening. In Flots, reminders are turned on task by task: save them for what costs a lot if you forget it, like the notice, canceling the internet box, the inspection appointment.
"Kitchen boxes" doesn't get done in one evening. Give it three sub-tasks, dishes, cupboards, appliances, and tackle one on a Tuesday evening when you have an hour to spare.
For the big picture, set four dated milestones: notice sent, quote signed, packing done, keys handed back. The project card shows the next one with its date. If the quote still isn't signed by then, it switches to "Overdue:", which still leaves time to call another mover.
Lease, quotes, inspection: documents in one place
A move generates paperwork: lease, signed quotes, insurance certificate, inspection reports. File them in the project's Documents tab. Flots accepts PDFs and photos, taken straight from the app on mobile, and a PDF opens in preview without downloading.
On moving day, take photos of the meter readings and each empty room. Those photos come in handy the day the security deposit is up for discussion. The move-in inspection report for the new place will come in handy again in a few years, when you leave it in turn.
The inventory note, room by room
The last piece: an "Inventory" note in the project, shared with all members. One heading per room, and under each heading the list of boxes with their number and what's inside. Headings, lists and checkboxes are all you need.
The number written on the box points back to the note. The day you're looking for the corkscrew, you know it's in box 12, "kitchen, drawers." On arrival, check off each box dropped in the right room: the missing one stands out right away.
During the first week, you'll open it between every box: pin it so it shows up as soon as you open the project.
Once everything is delivered and the last task is checked off, the project stays there, with the lease, the inspection report and the inventory. Keep it: in a few years, the list of subscriptions to notify won't have changed much.
Plan your move together in a shared project.
Dated tasks, reminders, documents and inventory in one place.